upload
U.S. Energy Information Administration
Industrie: Energy
Number of terms: 18450
Number of blossaries: 0
Company Profile:
The removal of sulfur, as from molten metals, petroleum oil, or flue gases.
Industry:Energy
Powdered cement, produced by heating a properly proportioned mixture of finely ground raw materials (calcium carbonate, silica, alumina, and iron oxide) in a kiln to a temperature of about 2,700 degrees Fahrenheit.
Industry:Energy
The preparation of a specific mineral deposit for commercial production; this preparation includes construction of access to the deposit and of facilities to extract the minerals. The development process is sometimes further distinguished between a preproduction stage and a current stage, with the distinction being made on the basis of whether the development work is performed before or after production from the mineral deposit has commenced on a commercial scale.
Industry:Energy
Aerosol particles that provide a platform for the condensation of water vapor, resulting in clouds with higher droplet concentrations and increased albedo.
Industry:Energy
Costs incurred to obtain access to proved reserves and to provide facilities for extracting, treating, gathering, and storing the oil and gas. More specifically, development costs, depreciation and applicable operating costs of support equipment and facilities, and other costs of development activities, are costs incurred to: *Gain access to and prepare well locations for drilling, including surveying well locations for the purpose of determing specific development drilling site; clearing ground; draining; road building; and relocating public roads, gas lines, and power lines to the extent necessary in developing the proved reserves. *Drill and equip development wells, development-type stratigraphic test wells, and service wells, including the costs of platforms and of well equipment such as casing, tubing, pumping equipment, and the well head assembly. *Acquire, construct, and install production facilities such as lease flow lines, separators, treaters, heaters, manifolds, measuring devices, production storage tanks, natural gas cycling and processing plants, and utility waste disposal systems. *Provide improved recovery systems.
Industry:Energy
The portion of the year in which a CO nonattainment area is prone to high ambient levels of carbon monoxide. This portion of the year is to be specified by the Environmental Protection Agency but is to be not less than 4 months in length.
Industry:Energy
Drilling done to determine more precisely the size, grade, and configuration of an ore deposit subsequent to when the determination is made that the deposit can be commercially developed. Not included are: *secondary development drilling, *solution-mining drilling for production,or *production-related underground and open pit drilling done for control of mining operations.
Industry:Energy
Areas with carbonmonoxide design values of 9.5 parts per million or more, generally based on data for 1988 and 1989.
Industry:Energy
A well drilled within the proved area of an oil or gas reservoir to the depth of a stratigraphic horizon known to be productive. Also see Well.
Industry:Energy
A readily combustible black or brownish-black rock whose composition, including inherent moisture, consists of more than 50 percent by weight and more than 70 percent by volume of carbonaceous material. It is formed from plant remains that have been compacted, hardened, chemically altered, and metamorphosed by heat and pressure over geologic time.
Industry:Energy