upload
George E King Consulting Inc.
Industrie: Oil & gas
Number of terms: 9502
Number of blossaries: 0
Company Profile:
George King is a technology provider in the oil and gas industry specializing in new technology and problem oil well solutions.
HPHT is where the undisturbed bottom hole temp at prospective reservoir depth or total depth is greater than 300oF or 150oC, and either the maximum anticipated pore pressure of any porous formation to be drilled through exceeds a hydrostatic gradient of 0.8 psi/ft, or a well requiring pressure control equipment with a rated working pressure in excess of 10000 psi.
Industry:Oil & gas
Hydraulic power make up tools suspended above the rig floor.
Industry:Oil & gas
Hydraulic workover/snubbing tubing running term – when the weight of the pipe is not sufficient to pull the pipe into a well against the surface pressure and additional force (snubbing) is required.
Industry:Oil & gas
Hydrocarbon condensates produced in conjunction with natural gas.
Industry:Oil & gas
Hydrocarbon from unconventional and more difficult to produce resources such as (hydrocarbon): shale gas, shale oil, heavy and viscous oil, hydrates, tight gas, etc.
Industry:Oil & gas
Hydrocarbon liquids with lower boiling points that may flash off when pressure is released.
Industry:Oil & gas
Hydrocarbon production that is delayed due to any of several reasons, specifically well repairs, restrictions that curtail production, regulations, etc.
Industry:Oil & gas
Hydrocarbons that contain one or more double or triple bonds.
Industry:Oil & gas
IADC-UBO term. Geothermal and non-hydrocarbon production. Maximum shut-in pressures are less than UBD equipment's operating pressure rating. Catastrophic failure has immediate, serious consequences.
Industry:Oil & gas
IADC-UBO term. Hydrocarbon production. Maximum shut-in pressures are less than UBD equipment's operating pressure rating. Catastrophic failure has immediate, serious consequences.
Industry:Oil & gas